Supporting farmer-oriented schemes

Fruit, flowers and vegetables after harvest management

Sr. No. Component Subsidy details Remarks Scheme
1. Pack house (size 9 X 6 Mts)
  • Unit cost: Rs.4 lakh/ unit
  • 50% of the unit cost limited maximum to Rs. 2 lakh/unit
  • Project based
Hrt-2, 3, 4, 9, 13, 14.
2. Integrated pack house with facilities for conveyer belt, sorting, grading units, washing, drying and weighing. (size 9 m X 18 m)
  • Unit cost: Rs. 50.00 lakh/ unit
  • For general category 35% of the unit cost limited to maximum Rs.17.50 lakh/unit.
  • For scheduled and hilly region, 50% of the unit cost limited to maximum Rs.25.00 lakh/ unit.
  • Project based
  • Credit linked back ended subsidy.
HRT-2, 3, 4, 9, 13, 14.
3. Pre-cooling unit
(capacity 6T)
  • Unit cost: Rs.25.00 lakh/ unit.
  • For general category 35% of the unit cost limited to maximum Rs.8.75 lakh/ unit
  • For scheduled and hilly region, 50% of the unit cost limited to Rs. 12.50 lakh/ unit.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category.
HRT-2, 3, 4, 9, 13, 14.
4. Cold room (staging) (capacity 30 MT)
  • Unit cost: Rs. 15.00 lakh/ unit
  • For general category 35% of the unit cost limited to maximum Rs.5.25 lakh/ unit
  • For scheduled and hilly region, 50% of the unit cost limited to Rs. 7.5 lakh/ unit.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category.
HRT-2, 3, 4, 9, 13, 14.
5. Mobile pre- cooling unit
  • Unit cost: Rs. 25.00 lakh/ unit
  • For general category 35% of the unit cost limited to maximum Rs.8.75 lakh/ unit
  • For scheduled and hilly region, 50% of the unit cost limited to Rs. 12.50 lakh/ unit.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
6. Cold Storage (Construction, Expansion and Modernization)
i) i) Cold storage units Type 1 - basic mezzanine structure with large chamber
(of >250 MT) type with single temperature zone
(capacity 5000 MT)
  • Unit cost: Rs. 8000/ MT
  • For general category 35% of the unit cost limited t o maximum Rs.2800/ unit
  • For scheduled and hilly region, 50% of the unit cost limited to Rs. 4000/ unit.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
ii) ii) Cold Storage Unit Type 2 – PEB structure for multiple temperature and product use, more than 6 chambers (of < 250 MT) and basic material handling equipment.( capacity 5000 MT)
  • Unit cost: Rs. 10000/ MT
  • For general category 35% of the unit cost limited to maximum Rs.3500/ unit
  • For scheduled and hilly region, 50% of the unit cost limited to Rs. 5000/ unit.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
iii) iii) Cold Storage Units Type 2 with add on technology for Controlled Atmosphere
  • Unit cost: Rs. 10000/ MT
  • For general category 35% of the unit cost limited to maximum Rs.3500/ unit
  • For scheduled and hilly region, 50% of the unit cost limited to Rs. 5000/ unit.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
7. Technology induction and modernisation of cold-chain
  • Unit cost: Rs. 250.00 lakh / unit
  • For general category 35% of the unit cost
  • For scheduled and hilly region, 50% of the unit cost.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
8. Refrigerated Transport vehicles
  • Unit cost: Rs. 26.00 lakh / MT
  • For general category 35% of the unit cost
  • For scheduled and hilly region, 50% of the unit cost.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
9. Primary / Mobile/ Minimal processing unit
  • Unit cost: Rs. 25.00 lakh / unit
  • For general category 40% of the unit cost
  • For scheduled and hilly region, 55% of the unit cost.
  • Project based
  • Credit linked back ended subsidy.
HRT-2, 3, 4, 9, 13, 14.
10. Ripening chamber ( capacity 300 MT)
  • Unit cost: Rs. 1.00 lakh / MT
  • For general category 40% of the unit cost limited to maximum Rs.0.40 lakh/ MT
  • For scheduled and hilly region, 50% of the unit cos limited to Rs.0.50 lakh/ MT.
  • Project based
  • Credit linked back ended subsidy.
  • Additional subsidy given by state government to general category 15% and 25% for reserved category
HRT-2, 3, 4, 9, 13, 14.
11. Evaporative / low energy cool chamber (8 MT)
  • Unit cost: Rs. 5.00 lakh / unit
  • 50% of the unit cost limited to maximum Rs.2.50 lakh/ unit
  • Project based
HRT-2, 3, 4, 9, 13, 14.
12. Preservation unit (low cost)
  • Unit cost: Rs. 2.00 lakh/ unit for new unit, Rs. 1.00 lakh/ unit for up-gradation of unit.
  • 50% of the unit cost.
  • Project based
  • Equipments of ISO Certified Company has to be purchased.
HRT-2, 3, 4, 9, 13, 14.
13. Low cost onion storage structure (25 MT)
  • Unit cost: Rs.1.75 lakh/ unit.
  • 50% of the unit cost.
  • Project based
HRT-2, 3, 4, 9, 13, 14.
14. Pusa Zero energy cool chamber (100 kg)
  • Unit cost: Rs. 4000/ unit
  • 50% of the unit cost limited to maximum Rs.2000 / unit
  • Project based
HRT-2, 3, 4, 9, 13, 14.
15. Integrated Cold Chain supply System
  • Unit cost: Rs. 600 lakh / project
  • For general category 35% of the project cost limited to maximum Rs.210 lakh.
  • For scheduled and hilly region, 50% of the project cost limited to maximum Rs.300.00 lakh.
  • Project based
  • Credit linked back ended subsidy.
  • Project should comprise of minimum two components listed under C.1 to C.13
Hrt -2, 3, 4, 9, 13, 14.
16. Export of horticulture produce through air way
  • Maximum Rs.10.00 lakh / annum/ beneficiary of the totals bills
  • Maximum upto 5 years subsidy/ beneficiary.
  • Transport bills 25% of the unit cost limited to maximum Rs.0.50/-
  • Documents required by beneficiary:
1)7/12 and 8-a for land holding details. 2)Proof of establishment or initiation of the organizations. 3)Audit report of last 3 years.
4)Proof of recognition of exporter 5)Proof of export loading and unloading.
  • Farmers/ farmers group, co-operative society can get the sub sidy.
  • Proof of being exporter and details of loading and unloading has to be given.
  • Application has to be done after 180 days of loading/unloading of the exported material.
HRT-2
17. Subsidy on electricity tariff for green house and tissue culture lab.
  • 25% of the bill limited to maximum Rs.1.00 lakh/ year.
  • Upto 5 years per beneficiary
  • Green house/ hi-tech green house/ poly house and tissue culture lab can get sub sidy for the usage of electricity.
  • Subsidy is allotted for the total bills of the year of the current financial year.
Hrt-2
  •  Government of Gujarat : External website that opens in a new window
  • DigiLocker
  • http://www.apeda.gov.in, APEDA : External website that opens in a new window
  • http://nhm.nic.in/, NHM : External website that opens in a new window
  • http://www.icar.org.in, ICAR : External website that opens in a new window
  • http://rkvy.nic.in, RKVY : External website that opens in a new window
  • http://mofpi.nic.in, MOFPI : External website that opens in a new window
  • Vibrant Gujarat Summit 2019
  • http://india.gov.in, The National Portal of India : External website that opens in a new window
  • Office of The Chief Electoral Officer, Gujarat State : External website that opens in a new window
Go to Navigation